All News
The construction of the Lodam Canal in Kunar province has progressed 80%
The technical team of Kunar sub...
Monitoring of the progress of the Ai Khanum Port Fortification Project was carried out
Maulvi Syed Ghulam Mashwani, head ...
A meeting was held for the purpose of making a plan for the year 1402 SH in Ningarhar sub river basin
The meeting was held with the participation ...
The water level of four rivers in Parwan province was measured
The officials of Ghorband-Charikar sub river ...
A preliminary survey of a checkdam and reservoir dam was conducted in Baghlan province
Officials of Baghlan river basin ...
The technical problems of the hydrometeorological stations in the Gomla River sub basin have been resolved
The technical teams of the ...
