All News
The water level of four rivers in Parwan province was measured
The officials of Ghorband-Charikar sub river ...
A preliminary survey of a checkdam and reservoir dam was conducted in Baghlan province
Officials of Baghlan river basin ...
The technical problems of the hydrometeorological stations in the Gomla River sub basin have been resolved
The technical teams of the ...
In 1402 SH year, 111 public projects will be implemented in Kapisa province
Mr. Engineer Kawah Khorosh, the head ...
The Director of Shirin Tagab-Maimana Sub River basin met with the Director of Dakar Office in the Northern Zone.
The Director of Shirin Tagab-Maimana ...
A meeting was held in Logar sub river basin
A meeting was held in....
The Kapisa sub river basin’s garden land has been stirred
Kawah Kharoosh, head of Kapisa sub...
In Faryab province, the cable way station was constructed
The technical officials of the ...